17. 05. 2023
Wallachian Plan Libre. Lidečko Parish Community Centre Jan Vojtíšek, Jakub Staník / studio AEIOU

Three individual buildings make up the church complex in the village of Lidečko. The baroque-style Church of St Katherine of Alexandria, the 16th century clergy house and a new parish community centre, which replaced the original 1950s cultural centre. The shape of the new parish centre follows the site boundary and delimits areas for outdoor activity. The symbolism of architecture as a processional passage underlines the meaning and function of the building. It begins with the public space in front of the church, continues along the walkway next to the covered outdoor space (with the inserted community centre), all the way to the back porch incorporating the remnants of the old stone wall. The community centre itself has variable layout options, a masonry load bearing structure, and larch shingle cladding. Building the Lidečko Parish Centre was a collective effort and the whole parish participated both financially and manually.

» entire article
15. 05. 2023
» entire article
14. 05. 2023
» entire article
13. 05. 2023
Ostrava – město bývalých i budoucích bulvárů Mariana Pančíková

Potřeba kvalifikovaně pečovat o podobu veřejného prostoru Ostravy vedla před více než třemi lety ke zřízení Městského ateliéru prostorového plánování (MAPPA). Ateliér nyní přichází s důležitým dokumentem Koncepce městské třídy 28. října – Opavská, který nastavuje celkový směr rozvoje a určuje, jak v Ostravě efektivně provádět velké investice v této lokalitě.

» entire article
09. 05. 2023
New Relations. Renovation and Modernisation of the Slovak National Gallery Complex in Bratislava Martin Kusý, Pavol Paňák / Architekti B.K.P.Š.

For the Slovak National Gallery building, a thorough renovation was long overdue—at least since the 2001 emergency closure of the exhibition space in the Bridging, a 1970s extension by architect Vladimír Dedeček connecting two opposite wings of the Gallery. Another part of the Gallery, the permanent exhibition this time, was closed off in 2012 due to inadequate conditions for the artwork. Finally, the library and the offices were shut down that same year. The renovation reconnects the disrupted functional relations, both inside the complex and with the neighbouring public areas. The main entrance axis from the old building’s courtyard is reaffirmed in the current layout, while a new axis, generated by Dedeček’s orthogonal grid, connecting the Gallery with the city centre, is integrated. Natural pedestrian paths are allowed to enter the ground floor and the courtyard. The Gallery becomes an open and welcoming institution.

» entire article


ERA21 vydává ERA Média, s. r. o.
Chleborádova 69/22, 619 00 Brno

Phone: +420 530 500 801
E-mail: redakce@era21.cz
Projekt se v roce 2024 uskutečňuje za finanční podpory: Ministerstva kultury ČR, Nadace české architektury, Statutárního města Brna a Státního fondu kultury ČR.
Copyright ©2004-2024 ERA Média, s.r.o
Použití článků a fotografií nebo jejich částí je bez souhlasu vydavatele zakázáno.

Information about cookies on this page

To get an idea of what you like to read, we use cookies on the website, which we process in accordance with the privacy policy. If you want to let us know what you are interested in, please give your consent to the processing of all types of cookies.

 

Cookie settings

The cookies that are used on this site are divided into categories and below you can find out more about each category and allow or deny some or all of them. Once you disable categories that were previously enabled, all cookies associated with that category will be deleted from your browser.